A working model of the case handling and robotic palletizing in Warehouse 1 (22 × 21 m, 460 m²), laid out from the floor plan. Cigarette master cases from SMD 1 cross the sky bridge along the north and west walls, are scanned on the bridge, spiral down to the floor and are sorted by SKU onto 16 lanes across the middle of the hall; four ABB IRB 660 robots (two north, two south) build single-SKU pallets, and AMRs carry them to the two transit rooms on the east side. Every case, pallet, robot, AMR and forklift move is simulated; product and pallet data can be changed below.
| Machine | Setpoint | Actual speed | IN | OUT | Status | Running |
|---|
| Lane | Pallet pos. | SKU | Status | On lane | Pallet | Done |
|---|
All values below are placeholders until the real data arrive. The pallet pattern, cases per pallet, lane buffers and the robot reach check are recalculated from these numbers.